ravenmade
May 19, 20151 min read
Studio Construction: Many Trades Make a Building
Drywallers clad the inside of the building with fireproof sheets of  plaster. All of the east wall windows have drywall right to the...
0 views0 comments
ravenmade
May 17, 20151 min read
New Work - 'Forest Flowers'
I am working on a new work for a Surface Design Association exhibition. It involves a number of different steps and techniques. Random...
0 views0 comments
ravenmade
May 14, 20151 min read
Studio Construction: Porch Floor
I was quietly working away at my desk when I heard a large truck arrive. It delivered a load of concrete onto the porch area. Citywide...
0 views0 comments
ravenmade
May 10, 20151 min read
Studio Construction: Porch Floor Preparation
Remember I posted about finding these bent rebar rods Dave had made. Now I know what they are for. He drilled holes in the foundation...
0 views0 comments
ravenmade
May 8, 20151 min read
Studio Construction: Services and Backfilling
Oohh! A new van. The plumber. The house water main now has a new line going off it - to the studio. The white line takes water to the...
0 views0 comments
ravenmade
May 7, 20151 min read
Studio Construction: Work Continues Inside and Outside
After the first day of securing the drywall panels in place. The ceiling is done. Ron and Dave check the work. Dave has been lining the...
0 views0 comments
ravenmade
May 5, 20151 min read
Studio Construction: Work Inside and Outside
Ron and I have the job of digging the trench to hold conduit for services from the house to the studio. Unfortunately, the trench passes...
0 views0 comments
ravenmade
May 2, 20152 min read
Studio Construction: Lots of Action on the Job Site
Our back yard is a very busy place. A small digger is moving backfill soil around according to the landscape plan. The sheet metal...
0 views0 comments
ravenmade
Apr 29, 20153 min read
Studio Construction: Cladding Choice
The east side now has 3 sheets of metal cladding. The biggest negative of cladding a building in steel is it has a poor thermal value...
0 views0 comments
ravenmade
Apr 27, 20151 min read
Studio Construction: Skilled and Unskilled Labour
Ron and I are at work, in the unskilled category. I am working with small tools and hands to carefully clear around tree roots that go...
0 views0 comments
ravenmade
Apr 25, 20151 min read
Studio Construction: Cladding
The largest wall is covered and taped. It is a wrap. The walls are now air tight and water proof. Carpenter Dave is attaching cement...
0 views0 comments
ravenmade
Apr 23, 20151 min read
Studio Construction: Wrapping Continues
Progress on wrapping the building. Dave has saved me the Tyvek scraps. It takes paint well and melts into a very textural surface....
0 views0 comments
ravenmade
Apr 22, 20152 min read
Studio Construction: The Site
The building is looking good. The site is another story. The combination of trench digging, lifting pavers, uprooting garden beds and...
3 views0 comments
ravenmade
Apr 20, 20152 min read
Studio construction: Plumbing, Strengthening, Finishing - Small but Important Work
The plumber made a first visit. This is the pipe that will connect to the sinks. It vents up to the roof and runs down through the wall...
0 views0 comments
ravenmade
Apr 18, 20152 min read
Studio Construction - A Roof
Ooh, another delivery truck with a load. And the guys are wearing special equipment. The load is going up on to the roof. At the same...
0 views0 comments
ravenmade
Apr 16, 20151 min read
Studio Design - Pattern Language: #107 Wings of Light and #109 Long thin House
Pattern Language #107 Wings of Light The studio is designed to have light entering the building on three sides. The solution to this...
1 view0 comments
ravenmade
Apr 14, 20152 min read
Studio Design - Pattern Language: #105 South Facing Outdoors, #106 Positive Outdoor Space
In an earlier post, I explained how I have used design method for the studio and the Back Yard Project. The first pattern I used was #104...
0 views0 comments
ravenmade
Apr 13, 20151 min read
Studio Construction: Windows and Doors
Eric the electrician came back to add electrical outlets and wires. I was asked where I wanted power and light. I was able to be decisive...
0 views0 comments
ravenmade
Apr 12, 20151 min read
Studio Construction: First Wall Layer Completed
View from the inside looking south towards the sunny room. The plywood wall layer is nearly finished. The plywood is finished, including...
0 views0 comments
ravenmade
Apr 11, 20151 min read
Studio Construction: Porch, Sunny Room and Electricity
The construction of the sunny room has begun. It is called the sunny room according to the design book It will be where I will sit and...
0 views0 comments