top of page

Studio Construction: Fixtures and Fittings

Aug 17, 2015

1 min read

0

0

0

Custom alt text

The hot water tank is installed in the crawlspace below the tub. This energy efficient placement means little heat is lost between the hot water tank and where I need the hot water.

Custom alt text
South Shore Cabinetry

 made and installed the cabinets and some of the furniture.

Here are my drawing and design desk areas...

Custom alt text

...backed by a bookcase.

Custom alt text

The print table gets its wheels.

Custom alt text

These drawers...

Custom alt text

...go into both sides of the dye station.

Custom alt text

A shelf is made to support the double tub.

Custom alt text

The tub is braced while the sealer cures.

The room is finally coming together and beginning to look like a studio. I am enjoying visualising how I will work at each of the stations.

Aug 17, 2015

1 min read

0

0

0

Comments

Share Your ThoughtsBe the first to write a comment.

Thank you for exploring Lesley Turner Art

bottom of page